CHAPTER 2 Introduction to PLC controllers

Introduction
2.1 First programmed controllers
2.2 PLC controller parts
2.3 Central Processing unit -CPU
2.4 Memory
2.5 How to program a PLC controller
2.6 Power supply
2.7 Input to a PLC controller
2.8 Input adjustable interface
2.9 Output from a PLC controller
2.10 Output adjustable interface
2.11 Extension lines

Introduction

Industry has begun to recognize the need for quality improvement and increase in productivity in the sixties and seventies. Flexibility also became a major concern (ability to change a process quickly became very important in order to satisfy consumer needs).

Try to imagine automated industrial production line in the sixties and seventies. There was always a huge electrical board for system controls, and not infrequently it covered an entire wall! Within this board there was a great number of interconnected electromechanical relays to make the whole system work. By word "connected" it was understood that electrician had to connect all relays manually using wires! An engineer would design logic for a system, and electricians would receive a schematic outline of logic that they had to implement with relays. These relay schemas often contained hundreds of relays. The plan that electrician was given was called "ladder schematic". Ladder displayed all switches, sensors, motors, valves, relays, etc. found in the system. Electrician's job was to connect them all together. One of the problems with this type of control was that it was based on mechanical relays. Mechanical instruments were usually the weakest connection in the system due to their moveable parts that could wear out. If one relay stopped working, electrician would have to examine an entire system (system would be out until a cause of the problem was found and corrected).

The other problem with this type of control was in the system's break period when a system had to be turned off, so connections could be made on the electrical board. If a firm decided to change the order of operations (make even a small change), it would turn out to be a major expense and a loss of production time until a system was functional again.

It's not hard to imagine an engineer who makes a few small errors during his project. It is also conceivable that electrician has made a few mistakes in connecting the system. Finally, you can also imagine having a few bad components. The only way to see if everything is all right is to run the system. As systems are usually not perfect with a first try, finding errors was an arduous process. You should also keep in mind that a product could not be made during these corrections and changes in connections. System had to be literally disabled before changes were to be performed. That meant that the entire production staff in that line of production was out of work until the system was fixed up again. Only when electrician was done finding errors and repairing,, the system was ready for production. Expenditures for this kind of work were too great even for well-to-do companies.

2.1 First programmable controllers

"General Motors" is among the first who recognized a need to replace the system's "wired" control board. Increased competition forced auto-makers to improve production quality and productivity. Flexibility and fast and easy change of automated lines of production became crucial! General Motors' idea was to use for system logic one of the microcomputers (these microcomputers were as far as their strength beneath today's eight-bit microcontrollers) instead of wired relays. Computer could take place of huge, expensive, inflexible wired control boards. If changes were needed in system logic or in order of operations, program in a microcomputer could be changed instead of rewiring of relays. Imagine only what elimination of the entire period needed for changes in wiring meant then. Today, such thinking is but common, then it was revolutionary!

Everything was well thought out, but then a new problem came up of how to make electricians accept and use a new device. Systems are often quite complex and require complex programming. It was out of question to ask electricians to learn and use computer language in addition to other job duties. General Motors Hidromatic Division of this big company recognized a need and wrote out project criteria for first programmable logic controller ( there were companies which sold instruments that performed industrial control, but those were simple sequential controllers û not PLC controllers as we know them today). Specifications required that a new device be based on electronic instead of mechanical parts, to have flexibility of a computer, to function in industrial environment (vibrations, heat, dust, etc.) and have a capability of being reprogrammed and used for other tasks. The last criteria was also the most important, and a new device had to be programmed easily and maintained by electricians and technicians. When the specification was done, General Motors looked for interested companies, and encouraged them to develop a device that would meet the specifications for this project.

"Gould Modicon" developed a first device which met these specifications. The key to success with a new device was that for its programming you didn't have to learn a new programming language. It was programmed so that same language ûa ladder diagram, already known to technicians was used. Electricians and technicians could very easily understand these new devices because the logic looked similar to old logic that they were used to working with. Thus they didn't have to learn a new programming language which (obviously) proved to be a good move. PLC controllers were initially called PC controllers (programmable controllers). This caused a small confusion when Personal Computers appeared. To avoid confusion, a designation PC was left to computers, and programmable controllers became programmable logic controllers. First PLC controllers were simple devices. They connected inputs such as switches, digital sensors, etc., and based on internal logic they turned output devices on or off. When they first came up, they were not quite suitable for complicated controls such as temperature, position, pressure, etc. However, throughout years, makers of PLC controllers added numerous features and improvements. Today's PLC controller can handle highly complex tasks such as position control, various regulations and other complex applications. The speed of work and easiness of programming were also improved. Also, modules for special purposes were developed, like communication modules for connecting several PLC controllers to the net. Today it is difficult to imagine a task that could not be handled by a PLC.

2.2 PLC controller components

PLC is actually an industrial microcontroller system (in more recent times we meet processors instead of microcontrollers) where you have hardware and software specifically adapted to industrial environment. Block schema with typical components which PLC consists of is found in the following picture. Special attention needs to be given to input and output, because in these blocks you find protection needed in isolating a CPU blocks from damaging influences that industrial environment can bring to a CPU via input lines. Program unit is usually a computer used for writing a program (often in ladder diagram).

2.3 Central Processing Unit - CPU

Central Processing Unit (CPU) is the brain of a PLC controller. CPU itself is usually one of the microcontrollers. Aforetime these were 8-bit microcontrollers such as 8051, and now these are 16- and 32-bit microcontrollers. Unspoken rule is that you'll find mostly Hitachi and Fujicu microcontrollers in PLC controllers by Japanese makers, Siemens in European controllers, and Motorola microcontrollers in American ones. CPU also takes care of communication, interconnectedness among other parts of PLC controller, program execution, memory operation, overseeing input and setting up of an output. PLC controllers have complex routines for memory checkup in order to ensure that PLC memory was not damaged (memory checkup is done for safety reasons). Generally speaking, CPU unit makes a great number of check-ups of the PLC controller itself so eventual errors would be discovered early. You can simply look at any PLC controller and see that there are several indicators in the form of light diodes for error signalization.


2.4 Memory

System memory (today mostly implemented in FLASH technology) is used by a PLC for an process control system. Aside from this operating system it also contains a user program translated from a ladder diagram to a binary form. FLASH memory contents can be changed only in case where user program is being changed. PLC controllers were used earlier instead of FLASH memory and have had EPROM memory instead of FLASH memory which had to be erased with UV lamp and programmed on programmers. With the use of FLASH technology this process was greatly shortened. Reprogramming a program memory is done through a serial cable in a program for application development.

User memory is divided into blocks having special functions. Some parts of a memory are used for storing input and output status. The real status of an input is stored either as "1" or as "0" in a specific memory bit. Each input or output has one corresponding bit in memory. Other parts of memory are used to store variable contents for variables used in user program. For example, timer value, or counter value would be stored in this part of the memory.

2.5 Programming a PLC controller

PLC controller can be reprogrammed through a computer (usual way), but also through manual programmers (consoles). This practically means that each PLC controller can programmed through a computer if you have the software needed for programming. Today's transmission computers are ideal for reprogramming a PLC controller in factory itself. This is of great importance to industry. Once the system is corrected, it is also important to read the right program into a PLC again. It is also good to check from time to time whether program in a PLC has not changed. This helps to avoid hazardous situations in factory rooms (some automakers have established communication networks which regularly check programs in PLC controllers to ensure execution only of good programs).

Almost every program for programming a PLC controller possesses various useful options such as: forced switching on and off of the system inputs/ouputs (I/O lines), program follow up in real time as well as documenting a diagram. This documenting is necessary to understand and define failures and malfunctions. Programmer can add remarks, names of input or output devices, and comments that can be useful when finding errors, or with system maintenance. Adding comments and remarks enables any technician (and not just a person who developed the system) to understand a ladder diagram right away. Comments and remarks can even quote precisely part numbers if replacements would be needed. This would speed up a repair of any problems that come up due to bad parts. The old way was such that a person who developed a system had protection on the program, so nobody aside from this person could understand how it was done. Correctly documented ladder diagram allows any technician to understand thoroughly how system functions.

2.6. Power supply

Electrical supply is used in bringing electrical energy to central processing unit. Most PLC controllers work either at 24 VDC or 220 VAC. On some PLC controllers you'll find electrical supply as a separate module. Those are usually bigger PLC controllers, while small and medium series already contain the supply module. User has to determine how much current to take from I/O module to ensure that electrical supply provides appropriate amount of current. Different types of modules use different amounts of electrical current.

This electrical supply is usually not used to start external inputs or outputs. User has to provide separate supplies in starting PLC controller inputs or outputs because then you can ensure so called "pure" supply for the PLC controller. With pure supply we mean supply where industrial environment can not affect it damagingly. Some of the smaller PLC controllers supply their inputs with voltage from a small supply source already incorporated into a PLC.

2.7 PLC controller inputs

Intelligence of an automated system depends largely on the ability of a PLC controller to read signals from different types of sensors and input devices. Keys, keyboards and by functional switches are a basis for man versus machine relationship. On the other hand, in order to detect a working piece, view a mechanism in motion, check pressure or fluid level you need specific automatic devices such as proximity sensors, marginal switches, photoelectric sensors, level sensors, etc. Thus, input signals can be logical (on/off) or analogue. Smaller PLC controllers usually have only digital input lines while larger also accept analogue inputs through special units attached to PLC controller. One of the most frequent analogue signals are a current signal of 4 to 20 mA and milivolt voltage signal generated by various sensors. Sensors are usually used as inputs for PLCs. You can obtain sensors for different purposes. They can sense presence of some parts, measure temperature, pressure, or some other physical dimension, etc. (ex. inductive sensors can register metal objects).

Other devices also can serve as inputs to PLC controller. Intelligent devices such as robots, video systems, etc. often are capable of sending signals to PLC controller input modules (robot, for instance, can send a signal to PLC controller input as information when it has finished moving an object from one place to the other.)

2.8 Input adjustment interface

Adjustment interface also called an interface is placed between input lines and a CPU unit. The purpose of adjustment interface to protect a CPU from disproportionate signals from an outside world. Input adjustment module turns a level of real logic to a level that suits CPU unit (ex. input from a sensor which works on 24 VDC must be converted to a signal of 5 VDC in order for a CPU to be able to process it). This is typically done through opto-isolation, and this function you can view in the following picture.
Opto-isolation means that there is no electrical connection between external world and CPU unit. They are "optically" separated, or in other words, signal is transmitted through light. The way this works is simple. External device brings a signal which turns LED on, whose light in turn incites photo transistor which in turn starts conducting, and a CPU sees this as logic zero (supply between collector and transmitter falls under 1V). When input signal stops LED diode turns off, transistor stops conducting, collector voltage increases, and CPU receives logic 1 as information.

2.9 PLC controller output

Automated system is incomplete if it is not connected with some output devices. Some of the most frequently used devices are motors, solenoids, relays, indicators, sound signalization and similar. By starting a motor, or a relay, PLC can manage or control a simple system such as system for sorting products all the way up to complex systems such as service system for positioning head of CNC machine. Output can be of analogue or digital type. Digital output signal works as a switch; it connects and disconnects line. Analogue output is used to generate the analogue signal (ex. motor whose speed is controlled by a voltage that corresponds to a desired speed).

2.10 Output adjustment interface

Output interface is similar to input interface. CPU brings a signal to LED diode and turns it on. Light incites a photo transistor which begins to conduct electricity, and thus the voltage between collector and emmiter falls to 0.7V , and a device attached to this output sees this as a logic zero. Inversely it means that a signal at the output exists and is interpreted as logic one. Photo transistor is not directly connected to a PLC controller output. Between photo transistor and an output usually there is a relay or a stronger transistor capable of interrupting stronger signals.


2.11 Extension lines

Every PLC controller has a limited number of input/output lines. If needed this number can be increased through certain additional modules by system extension through extension lines. Each module can contain extension both of input and output lines. Also, extension modules can have inputs and outputs of a different nature from those on the PLC controller (ex. in case relay outputs are on a controller, transistor outputs can be on an extension module).

Hiç yorum yok:

Cascode stage
or “collector follower”
Jean-Paul Brodier
All microprocessors from the 8051 family have inputs and outputs that are ‘quasi-bidirectional’. This means that when power is first applied, the ports behave as inputs with a logic high level and a weak pull-up.,

Glitch
a relay or some other load such as When driving an optocou-pler or LED, there is a problem
at power on: the NPN transistor in the common emitter connec­tion (Figure 1) causes an unde­sirable excitation of the load from the moment power is applied until the microprocessor has had the chance to turn the output low. In addition, logic high outputs are seldom able to deliver enough current to drive the transistor into saturation because they have been designed to be active low.
Figure 1. An NPN transistor drives a load.
To solve both of these problems in one hit, we have to make the active level logic low. This can be done in three different ways: use an emitter follower as a buffer stage (Figure 2a), an inverter in a common emit­ter circuit (Figure 2b) or an inverter/open collector circuit (Figure 2c). The disadvantage of solution 2a is the fact that the voltage to the load is reduced. In the case of a relay with a 5-V coil there is the risk that the resulting voltage is too low. The disadvantage of examples 2b and 2c is that they require more parts.
Collector follower
That leaves the open collector buffer in the form of an IC type 7404. This solution, however, also has a few disadvantages. You do not always need all of the 6 buffers in one IC. Also, the SMD version can only handle 12 V. This is too low and dan­gerous if we happen to supply the load from an unregulated voltage.
The solution presented here com­bines in one transistor the advan­tages of the emitter follower (inactive when power is first applied) and open collector (higher power supply voltage, lower current). This circuit has been known since the valve era by the name cascode (drive via the cathode). The goal was to reduce the Miller-effect of the internal (parasitic) capacitances. Not having the option of reduc­ing the capacitance between the internal electrodes, a lower volt­age was used instead. The cas-code circuit is often used in pow­erful transmitters (tens of kW) to minimise the Miller-effect. This circuit was also used to limit tran­sistor conduction and to keep the dissipation within bounds, which increased the life of bipolar tran­sistors. This was in the IGBT and VMOS era.
The transistor conducts only when the output from the micro­processor is low (refer Fig­ure 3). The base current is lim­ited by resistor R. This current is determined by the current flow­ing through the load. When the power is switched on, both the base and emitter see the same potential, VCC, so the transistor remains blocked. One thing we have to keep in mind: we may not exceed the current rating of the microprocessor output because it has to cope with all the current flowing in the emitter of the transistor.
In the case of the quite common 80C51, this maximum current is typically 3.2 mA (two LS TTL loads). This is sufficient to drive an LED without overloading the 5-V regulator, or for driving a PNP power stage at the high side (Figure 3b). The parallel Philips PCF88574 I2C interfaces can handle 25 mA. For the Atmel AT89Cx051 as well as for the Philips P89LPC9xx the limit is 20 mA. For the latter type the cascode circuit or ‘collector fol­lower’ is even more interesting when the outputs are configured as open-drain because the nom­inal voltage is only 3.6 V. In all cases we have to make sure that the maximum dissipation of the
Figure 3. Cascode driver stage with discrete transistor.
package is not exceeded. 24 V is sufficient to energise its are determined by the power
Should this be the case, then the half Watt relay coil, which in PNP (or VMOS) transistor.
number of open collectors turn can drive a load of 16 A at The cascode transistor can be a required will probably justify 230V. ‘digital’ type with integrated resorting to a 7404. For loads driven from the positive base and emitter resistors.A current of around 20 mA at side, the voltage and current lim-


pot as interrupt generator

In battery-powered, microcon­troller driven circuits, as well as with microcontrollers operating in cars, it is desirable to switch the micro into power-down mode once a task has been completed. An interrupt request is then required to wake up the micro. This circuit allows an interrupt to be generated in a simple way using a common potentiometer. In the example circuit, the pot may also copy its spindle position to the ADC. This enables the pot to be used for continuously variable settings (like volume) as well for getting the micro out of its power-down mode.
IC1A is configured as a differen­tiator with R3 preventing oscillation by keeping the gain down to 10 times. Because the opamp oper­ates off a single-rail supply voltage, an 18k/10k potential divider (R1/R2) is able to create a virtual ground level at +1.75 V. This can be done because the LM358 can handle input levels of up to 3.5 V when supplied at 5.0 volts. IC1A supplies a brief High pulse at a falling input voltage, and a similar Low pulse when the input voltage rises. In order to get a High pulse when the potentiome­ter spindle is turned cw or ccw, IC1B is set up as an inverter. Next, each opamp output drives the base of a BC547 transistor. The 5 V-to-0 V transitions at both collector outputs are shaped and combined into a usable interrupt pulse by three NOR gates IC2A, IC2B and IC2C.If the potentiometer spindle is turned very slowly, it is possible that the circuit does not respond
That is why an LED has been added that lights briefly when a pulse is generated. Finally, a tip: a 100-pF capacitor may be connected in parallel with R5 for additional suppres­sion of self-oscillation.

elektor time standart


Elektor Time standard (1988)
Jan Buiting

The Elektor Time Standard and associated Slave Unit were spin-offs of another hugely successful project, the DCF77 Receiver / Locked Frequency Standard. The receiver was published in the January 1988 issue, the Time Standard and Slave display in the next two issues. All units were housed in then very fash­ionable and (expensive!) Ver-obox two-part ABS enclosures which had also been used for a number of Elektor test instrument designs published between 1984 and 1987. The Time Standard box was designed to process seconds pulses received from the VLF (77.5 kHz) DCF77 time standard transmitter in Mainflingen, Ger­many, and display time (with atomic accuracy) and date on an LC display. The circuit was based on then extremely popular 8052AH-BASIC microcontroller from Intel, a device, we can safely claim, that made it to fame & glory thanks to Elektor Electron-
ics. The 40-way DIL chip con­tained a BASIC interpreter capa­ble of executing ‘tokenised’ code from an external EPROM. This, we were told by our resident designer Peter Theunissen, made writing the DCF77 time signal decoding routines ‘a doddle’ using his specially adapted BASIC computer and interpreter. For example, when concerns were raised (by myself) that not all of Europe was in the time zone served by DCF77 (i.e., CET or GMT+1h), a menu option was quickly added to allow users to select between UTC and GMT+1h. As a relative novelty, a ready-made self-adhesive front panel foil with built-in membrane keys was designed into the proj­ect. This expensive item had been produced specially for Elektor. However, when the article went into print (using a rather glum page layout and black & white print), there were yet other con­cerns regarding the range of the DCF77 transmitter. This is offi­cially claimed as “approximately 1,000 km by groundwave propa-

gation”. A quick use of a com­pass and a map of Europe sug­gested that the signal would only cover the south-eastern part of the UK, possibly including Greater London. For a couple of months we waited with baited breath for readers’ responses, only to receive two enthusiastic reception reports, one from the East coast of Ireland and another from Riyadh, Saudi Arabia! The latter report came from a reader work­ing at a chemical laboratory. I remember he wrote that DCF77 could be received for a few min­utes a day only, synchronising the clock, usually around nightfall despite heavy ‘static’. A huge wire antenna was used (nothing like the 1-inch ferrite rods we used in our lab, which is less than 100 km away from Mainflingen). Although the BASIC program list-
ing for the Time Standard was freely distributed to interested readers (on paper, in an enve­lope, by snail mail!), only very advanced readers were able to compile the program into tokenised code and burn it into an EPROM. Most other readers had to rely on a ready-pro­grammed 27C64 supplied through our Readers Services. Apart from displaying time and date at atomic accuracy, the Time Standard was also capable of outputting time/date information

in the form of ASCII character strings for other (intelligent) equip­ment to use, for example, a timer or switching clock. Although sales figures of the PCB and EPROM were in the hundreds, I never heard from anyone actually hav­ing enjoyed the wonders of the ASCII output so extensively described in the article. The Slave unit published in March 1988 was connected to the Time Standard via screened (micro­phone) cable, the idea being that one or more Slave units could be installed on walls in rooms at some distance from the main clock unit. Central timekeeping deluxe for offices, labs, schools and workshops, but at what an expense and design effort! Not too many PCBs were sold for this extension of the Time Standard.